Today's activities: - All the turbos have been valved out and switched off - The corner was vented through the Y-manifold vent valve, with 3-4 Torr/min speed - it took 3.5 hrs - As a side effect, the current of GV5's AIP went up, so now this Annulus volume is being pumped with an aux cart - Another aux cart is pumping the RGA in the corner (between HAM5 and HAM4)