TITLE: 04/07 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 18mph Gusts, 10mph 3min avg
Primary useism: 0.04 μm/s
Secondary useism: 0.29 μm/s
QUICK SUMMARY:
The CDS team is currently working on getting the control room screens and other systems back up from the power outage last night.
Today we have a vent coordination meeting at 15:30UTC.
Plans for today: