I've been trying to recover seismic systems this morning after the power outage. So far, I've gotten HEPI pump stations back up, all the ISI are damping. Worked with Patrick to get both BRS are back up and running, but their heating was off for a while and it will take some time to get back to a good state.
ETMY and HAM8 however have some issue with the binary read backs for their coil drivers. I've check the racks and the overtemp relay lights are all good, but the binary read backs indicate a number of the overtemp relays are tripped. Not sure what the cause is yet, but fixing these isn't a priority today. Working with Dave, I power cycled both the binary in and coil drivers for HAM8, but that didn't fix the readbacks. Similar to this alog, we just put in test offsets to get the bit word clean and will wait for Fil to be available to try opening the expansion chassis. These tables should be able to isolate now, not that they are needed. Dave has filed and FRS and the test offset shows up in SDF.
And now the EY bit word has fixed itself, I've removed the fix Dave put in.