Displaying report 1-1 of 1.
Reports until 13:04, Tuesday 08 April 2025
H1 General (EPO)
corey.gray@LIGO.ORG - posted 13:04, Tuesday 08 April 2025 - last comment - 13:21, Tuesday 08 April 2025(83790)
HAM1 BEFORE SEI De-install / ISI Install Photos + Contamination Control Tasks

HAM1 Before Photos:  (HAM1 chamber open just under 90min for this activity)

This morning before the deinstall activities begin, took the opportunity to photo document the HAM1 optical layout.  Keita requested I take photos to record the layout wrt to the iLIGO bolt pattern, because rough alignment of optical components on the new SEI ISI for HAM1 will be done utilizing the bolt patterns of the Optics Tables; so I took a few more photos than normal (top view and angled with a focus on the REFL path).  Took large photos with the Canon 60D DSLR camera as well as my camera phone.  

The photos are being populated in this Google Drive folder:  https://drive.google.com/drive/folders/1yDKp7aByA_TYJ12c8j8BnZM_pd1Q2DBZ?usp=sharing

Naming each photo referencing an updated layout Camilla Compton made which labels all beam dumps, but I also had to use an older layout to preserve naming since the layout on HAM1 currently looks like D1000313v16 (which is also referenced for naming the photos).

The above folder has the Canon photos, and I'll be adding the camera phone images next.

Contamination Control Notes:

Images attached to this report
Comments related to this report
jeffrey.kissel@LIGO.ORG - 13:21, Tuesday 08 April 2025 (83816)ISC, SEI, SUS, SYS
Tagging ISC, SUS, SYS, and SEI. Rest in power HAM1 Stack!
Displaying report 1-1 of 1.