TITLE: 04/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 18mph Gusts, 15mph 3min avg
Primary useism: 0.04 μm/s
Secondary useism: 0.23 μm/s
QUICK SUMMARY:
Plans for today:
- FAC - 2nd Cleaning BSC8
- Investigate large shifts in trends of PRM and PR2 in YAW - see MON alog of realignment restoration work
- IAS - HAM1 Stack table survey
- IAS - HAM1 support tube ends?
- JIM/MITCH - HAM1 Offload HEPI Setup, disconnect actuators
- ISC - HAM1 - ISC component removal
- VAC/FAC - BSC8 Door Off - CRANE to Caddy
- VAC - Start Feedthru Swap
- EE - HAM4-5 Cable tray work - Ken, some Crane usage