The DAQ's EDC is green again. Erik and Camilla started the HWS EX and EY IOCs which were the last needed to complete the set.
Daniel and Patrick confirmed that the two Beckhoff terminals lost at EX are the AOS baffle PDs, which are not immediately needed but will be needed to return to O4. For now I have "greened up" the CDS overview by configuring DEV4 to expect 125 terminals of 127 total.
To remind us that DEV4 is in a degraded state, and that DEV1 was degraded in Dec 2024 when it lost its illuminators, these are shown with a darker green block.