Reports until 16:38, Tuesday 08 April 2025
H1 General
oli.patane@LIGO.ORG - posted 16:38, Tuesday 08 April 2025 (83821)
Ops Day Shift End

TITLE: 04/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

More vent work today. I was able to mark some things fully or partially done, but others I'm unaware of their current status

DONE            FAC - 2nd Cleaning BSC8
DONE            Investigate large shifts in trends of PRM and PR2 in YAW (83807, 83808)
DONE            IAS - HAM1 Stack table survey
PARTIALLY   JIM/MITCH - HAM1 Offload HEPI Setup, disconnect actuators
PARTIALLY   ISC - HAM1 - ISC component removal
PARTIALLY   VAC/FAC - BSC8 Door Off - CRANE to Caddy
                       VAC - Start Feedthru Swap
                       EE - HAM4-5 Cable tray work - Ken, some Crane usage
                       IAS - HAM1 support tube ends?


LOG:                                                                                                       

Start Time System Name Location Lazer_Haz Task Time End
14:44 FAC Kim, Nelly LVEA n Tech clean (HAM1, restock) 17:26
14:56 FAC Eric HAM Shack n Annual maintenance 16:38
15:10   Betsy LVEA n Taking to FAC 15:25
15:23 VAC Jordan LVEA N Dew point check 15:36
15:34 IAS Jason, RyanC LVEA n FAROing 18:57
15:51 VAC Jordan, Melina EX n Checking on ion pump 16:22
15:52   Betsy OpticsLab n Prepping to recrimp cables 16:55
15:53 FAC Tyler LVEA, HAM Shack n Checking on things 19:07
16:25 EE Marc CER n Grabbing label maker 16:35
16:58   Corey, Mitchell MY n Grabbing tooling 17:28
17:01 SUS Betsy LVEA N BSC8 Dust Count Check 17:20
17:02 FAC Chris, Pest Control LVEA n Pest control 18:06
17:03   TJ Mech Room n Checking out dust monitors 17:10
17:08 ISI Jim LVEA n Checking if HAM1 is ready 17:45
17:12   TJ LVEA n Checking dust monitor 17:44
17:50 FAC Kim, Nellie EX N Technical cleaning 18:43
17:54 SEI Jim, Mitchell LVEA n HAM1 work 18:01
18:00 VAC Jordan, Melina, Travis LVEA n Start removal of HAM6 turbo pump 19:16
18:01   Mitchell, Jim HAM Shack n Looking for parts 18:15
18:06 FAC Chris LVEA N Equipment check 18:57
18:12 PEM Robert LVEA n Talking to VAC 18:34
18:13   TJ LVEA N Dust monitor test 18:24
18:15 SUS Jim, Mitchell LVEA N HEPI Offload 19:37
18:26 ISC Betsy, Camilla LVEA n Prepping for stuff removal at HAM1 19:15
19:07   Josh, Jeff, +2 LVEA n Tour 19:46
19:42 FAC Travis, Jordan, Randy LVEA N BSC8 Door move 00:19
20:18 ISC Betsy, Elenna, Camilla LVEA n Checking HAM1 layout discrepencies 23:20
20:25   Richard LVEA n Walkabout 22:28
20:52 FAC Tyler, Alpine roofing EY n Looking at roof 21:44
20:58 EE Marc CER n labeling 21:44
20:59   Mitchell, Jim LVEA n HAM1 feedthrough 23:27
21:42   TJ LVEA n Talking about discrepencies 21:58
22:01 VAC Travis MX/MY N Conflat blank 22:29
22:04 FAC Ryan C LVEA N Dust monitor check 22:38
22:29   Oli LVEA N HAM1 deinstall help 23:20
22:30 VAC Travis LVEA N Turbo Swap 00:30
22:30 FAC Richard LVEA N Walkabout + Headcount 22:44
22:49 FAC Tyler, Water contractor Water Tank N Continuing potable water restoration work 00:49
23:35   RyanC LVEA n Checking on dust monitor 00:05