TITLE: 04/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: HAM6 turbo work completed, BSC8 work progressed, and HAM1s passive stack was cleared off, the cabling was removed, and the passive stack's tabletop is on a pallet.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:35 | FAC | Nelly, Kim | LVEA | n | Tech clean (in at 14:20) | 17:58 |
14:36 | FAC | Randy | LVEA | n | Crane over YARM (in at 14:35) | 14:49 |
15:10 | VAC | Jordan | LVEA | n | Purge air checks | 15:23 |
16:07 | SLiC | Tony, Ibrahim, Sheila, Betsy, Robert | LVEA-BSC8 | n | BSC8, ITMY CP | 18:38 |
16:08 | ISC | Camilla, Elenna, Oli, Rahul | LVEA-HAM1 | n | HAM1 parts removal, Oli & Elenna out 18:30, Camilla 18:48 | 18:49 |
16:13 | CDS | Fil, Marc, Corey | Opt Lab | n | HAM1 cable prep, corey out @ 1800UTC | 19:42 |
16:24 | Property | Christina | Mids | n | Pelican case check | 16:44 |
16:39 | SEI | Jim & Mitch | LVEA | N | HEPI actuators disconnect cont | 18:44 |
16:41 | VAC | Travis, Melina, Jordan | LVEA | N | HAM6 turbo | 19:13 |
16:42 | SPI | Jeff, Josh | Optics lab | N | SPI pickoff install prep | 19:01 |
17:08 | IAS | Jason | LVEA | N | FARO temperature troubleshooting | 17:47 |
17:21 | OPS | TJ | LVEA | N | Check for tooling | 18:31 |
17:58 | OPS | Jennie, Matt+2 | LVEA | N | TOur for new fellows | 18:20 |
17:59 | FAC | Nelly | MidY | N | Tech clean | 18:54 |
18:24 | FAC | Richard | LVEA | N | Safety checks | 18:36 |
18:54 | FAC | Nelly | MidX | N | Tech clean | 19:27 |
19:05 | SPI | Jeff, Josh | Optics lab | LOCAL | SPI work | 19:34 |
19:38 | ISC | Camilla, Rahul | LVEA | N | HAM1 parts removal, Rahul out 20:42 | 20:54 |
19:43 | ISC | Elenna | LVEA | N | Grab drawing by HAM1 | 19:47 |
19:43 | ISC | Tj | LVEA | N | HAM1 work, platform stair removal | 23:26 |
19:49 | FAC | Randy | LVEA | N | HAM1 work, forklifting | 22:00 |
19:59 | CDS | Dave | MidX | N | Wind sensor, midy and ends after for various fixes | 20:51 |
20:09 | ISC | Corey | LVEA | N | HAM1 work | 23:25 |
20:11 | FAC | Richard | LVEA | N | Checks/Walkthrough, in and out | 21:04 |
20:23 | OPS | Oli | LVEA | N | Wrap bag and tag | 23:26 |
20:23 | ISC | Mitch, Jim | LVEA | N | HAM1 passive stack, Mitch out 23:20 | 23:26 |
20:44 | VAC | Jordan, Melina | LVEA | N | HAM6 turbo work | 22:33 |
20:47 | EE | Fil, Marc | Optics Lab | Local | Measurements | ? |
21:02 | ISC | Ibrahim, Robert, Sheila | LVEA | N | BSC8 ITMY work | 22:28 |
21:09 | ISC | Betsy | LVEA | N | Join BSC8 ITMY crew | 22:36 |
21:24 | FAC | Richard | LVEA | N | Steel toe shoe count | 22:01 |
22:13 | FAC | Tyler | LVEA | N | CHeck out HAM1 progress | 22:28 |
22:25 | FAC | Richard | LVEA | N | Safety checks | 22:50 |
22:29 | FAC | Tyler | LVEA | N | Quick check | 23:20 |