TITLE: 04/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 5mph Gusts, 3mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.12 μm/s
QUICK SUMMARY:
Plans for today:
- BSC8 - ITMY and R0 TFs after alignment complete
- HAM1 CRANE/FORKLIFT - SEI Stack removal, continued
- HAM1 ISC prep - Recheck all RMs with FRS ticket issues
- HAM1 ISC prep - check all removed cables for loose screws
- HAM1 ISC prep - Inspect Optics and beam dumps, FC if needed
- HAM1 ISC - rework M12 and M15
- JASON - IAS HAM1 support tube ends?
- BSC1 (via BSC8) - CPY work starts - crew to map beams inside at spool, adjustment continued (Betsy, Robert, Sheila, Tony)