WP 12451
The air RFPD cables were disconnected from the HAM1 feedthroughs (D6 and D5) and pulled back to ISC-R2. Cables were disconnected from the patch panels and removed from the rack. The air REFL WFS cables going to ISCT1 were removed, this included POPAIR_X. Daniel started installation of the new/modified patch panels in ISC-R2. The long RF cables will be re-terminated/labeled next week in the EE lab with female SMA connectors.
F. Clara, R. McCarthy, M. Pirello, D. Sigg