Reports until 16:55, Thursday 10 April 2025
H1 CDS (ISC)
filiberto.clara@LIGO.ORG - posted 16:55, Thursday 10 April 2025 (83862)
HAM1 AIR RFPD Cables

WP 12451

The air RFPD cables were disconnected from the HAM1 feedthroughs (D6 and D5) and pulled back to ISC-R2. Cables were disconnected from the patch panels and removed from the rack. The air REFL WFS cables going to ISCT1 were removed, this included POPAIR_X. Daniel started installation of the new/modified patch panels in ISC-R2. The long RF cables will be re-terminated/labeled next week in the EE lab with female SMA connectors.

F. Clara, R. McCarthy, M. Pirello, D. Sigg