TITLE: 04/11 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 5mph Gusts, 3mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.22 μm/s
QUICK SUMMARY:
Left over tasks from yesterday:
On the docket for today is:
BSC8 - Prep for Closeout
BSC8 - DOOR ON
HAM1 - Prep for ISI install
VAC Start Feedthru Swap
The IAS support tube survey will likely not happen as the recent power outage has seemingly damaged the FARO (specifically its external temperature sensor) and it needs to be seen by their service team. We are waiting to hear about a rental unit in the meanwhile.