TITLE: 04/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 1mph Gusts, 0mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.13 μm/s
QUICK SUMMARY:
The vent continues, on the Trello for today is:
- Guardian Work, DAQ restart - TJ
- HAM1 - Install ISI tooling
- HAM1 ISC prep - check all removed cables for loose screws, continued
- HAM1 ISC prep - Inspect Optics and beam dumps, FC if needed, continued
- HAM1 ISC prep - Recheck all RMs with FRS ticket issues, continued
- VAC - Start Feedthru Swap, need Betsy for some cables, continued, mostly done except 1-2 small ones
- PSL/FIL - Moving picomotor driver, pull cables
- EX and EY - ALS work beam profiling