TITLE: 04/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: HAM1 work is chugging along, the ISI installation structure/fixtures is set up and ready.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:15 | FAC | Randy | LVEA | N | Moving stuff | 14:37 |
14:44 | FAC | Nellie | EndX | N | Tech clean | 14:49 |
15:14 | FAC | Nellie | LVEA | N | Tech clean | 16:38 |
15:19 | VAC | Jordan | LVEA | N | Purge air check | 15:25 |
15:37 | FAC | Kim | LVEA | N | Tech clean | 16:51 |
15:59 | ALS | TJ | EX, EY | N | Turning on ALS lasers | 16:52 |
15:59 | ISC | Matt | OpticsLab | N | Looking for mount | 16:15 |
16:14 | VAC | Travis, Jordan | LVEA | N | BSC anulus ion pump, CR turned off | 18:22 |
16:25 | OPO | Sheila, Andrew | LVEA | N | Tech clean | 16:43 |
16:28 | FAC | Tyler | Site | N | Capital equipment inventory checks | 20:06 |
16:33 | FAC | Richard, Tony | LVEA | N | Safety checks, out and back in 16:42, 17:30 | 18:04 |
16:38 | FAC | Nellie | EndX | N | Tech clean | 17:28 |
16:49 | ISC | Betsy | LVEA | N | HAM1 VAC feedthrough check | 18:36 |
16:51 | FAC | Kim | EndY | N | Tech clean | 17:45 |
16:55 | ISC | Camilla, Sheila | LVEA | N | HAM5/6 CR, move optics | 17:24 |
17:04 | GRD | TJ | CR | N | New SEI and SUS GRDs | 17:29 |
17:28 | ALS | Camilla, Sheila, TJ, Matt, Andrew | EY | YES | ALS beam profiling | 19:26 |
17:52 | VAC | Jim, Tony | LVEA | N | HAM1 ISI risers installation | 18:59 |
18:07 | FAC | Randy | LVEA | N | Craning around HAM1 | 18:52 |
18:11 | ISC | Mitch | LVEA | N | Join HAM1 work | 18:52 |
18:16 | FAC | Richard | LVEA | N | Safety checks | 18:32 |
19:06 | SQZ | Jeff | LVEA | N | SPI optics | 20:25 |
19:26 | EE | Betsy, Fil | LVEA | N | HAM1 Cabling, Betsy out 20:20 | 22:20 |
19:20 | ISC | Daniel | LVEA | N | HAM1 checks | 20:20 |
19:28 | EE | Marc | LVEA | N | HAM1 racks ISC cabling, RMs | 22:10 |
19:43 | FAC | Randy | LVEA | N | HAM1 work | 20:12 |
20:09 | FAC | Richard | LVEA | N | Safety checks | 21:37 |
20:11 | ISC | Jim, Mitch, Corey, Randy | LVEA | N | HAM1 tooling checks, iSI instal supports, Randy out 22:20 | 22:40 |
20:12 | VAC | Travis | LVEA | N | Join HAM1 work | 22:00 |
20:16 | VAC | Jordan | LVEA | N | Ytube RGA manifold setup/prep | 23:29 |
20:27 | ISC | Maggie | LVEA | N | Talk to Corey | 21:08 |
21:18 | ISC | Betsy | LVEA | N | Check with HAM1 crew | 21:46 |
21:28 | ISC | Camilla, Matt | LVEA | N | HAM5/6 CR optics first contacting | 22:43 |
21:38 | FAC | Richard | LVEA | N | Safety checks | 22:42 |
22:36 | VAC | Travis | LVEA | N | Add flange protector HAM! | 22:59 |
22:41 | EE | Marc | Mezz | N | Investigate power supplies | 23:22 |
22:46 | ISC | Betsy | LVEA | N | Checks | 23:05 |
23:17 | ISC | Matt, Camilla | LVEA HAM5/6 CR | N | First contacting optics | Ongoing |
17:15 UTC a 5.5 from southern California came through
For the trello tasks today: