Reports until 16:58, Tuesday 05 November 2013
H1 SEI
hugh.radkins@LIGO.ORG - posted 16:58, Tuesday 05 November 2013 (8390)
WBSC3 SEI HEPI Raised to Put ITMx at height

As SUS completed the ~6mm shift North yesterday, our turn to hoist the ITMx to height.  IAS logged that the ITMx need to be lifted by 3.6mm; however on 24 Oct I observed the Optical Table to be just 1.8mm low.  So I split the difference and lifted the system 2.7mm.  All went smoothly with low SD of the DI readings and very little off axis movement.  We'll see what IAS says next.  I was not able to evaluate the level of the table.  We'll do that when we do next tweeks and personnel are available.