As SUS completed the ~6mm shift North yesterday, our turn to hoist the ITMx to height. IAS logged that the ITMx need to be lifted by 3.6mm; however on 24 Oct I observed the Optical Table to be just 1.8mm low. So I split the difference and lifted the system 2.7mm. All went smoothly with low SD of the DI readings and very little off axis movement. We'll see what IAS says next. I was not able to evaluate the level of the table. We'll do that when we do next tweeks and personnel are available.