J. Kissel, S. Koehlenbeck, J. Oberling, R. Short, J. Freed ECR E2400083 IIET 30642 WP 12453 After this morning's kerfuffle / belated power-outage recovery with the PSL HVAC system was resolved, Sina, Ryan, and Josh began the procedure we're walking thru outlined in Section 1 of T2500024. We're keeping running notes on the fly at the bottom of the google-doc for now. In summary here, with more details to come, we got as far as - Clearing out some old IO equipment that unused and in the way of the SPI pick-off path - Measuring the power around ALS-PBS01 - Installing the new ALS/SPI 80R/20T beam splitter - Measuring the beam profile along the future SPI path, in reflection of this 80R/20T beam splitter.