TITLE: 04/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
The Vacuum team has started the Pump Down !
The SPI team has components on the table and are currently in an optomization stage.
I think Jim still has more work to do on HAM1.
Joe doing update of installed pydarm code.
At 21:38 UTC the water level sensor for the fire tank was restarted by Eric because it was reading as full but was not.
21:48 UTC the Water tank sensor was restarted to make the Water level sensor read correctly.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:53 | FAC | Randy | LVEA | N | Prepping for work | 14:08 |
14:54 | FAC | Mitchel & Randy, Jim, Corey | LVEA | N | Craning parts | 18:54 |
14:54 | FAC | Kim & Nellie | LVEA | N | Technical Cleaning | 16:54 |
15:19 | VAC | Jordan | LVEA | n | Purge Air checks | 15:47 |
16:39 | VAC | Janos | LVEA | N | Walkin the LVEA to get caught up on the VAC Status | 16:54 |
16:47 | VAC | Jordan | LVEA | N | Check Turbo pump on BSC7 & Prep Turbos for Pump Down | 18:57 |
16:52 | IAS | Jason | LVEA | N | Setting up Surveying Equipmentr | 19:07 |
16:53 | PSL | Ryan S | PSL | YES | PSL checks and SPI work | 19:59 |
16:53 | IAS | Ryan C | LVEA | N | Surveying with jason | 17:41 |
17:02 | VAC | Travis | LVEA | N | LVEA ouput arm with HAM1 flanges | 17:08 |
17:04 | SPI | Josh | Optics Lab | yes | Getting parts for PSL SPI work | 17:34 |
17:28 | ISI | Betsy | LVEA | N | Checking on HAM1 crew | 18:07 |
17:31 | SPI | Sina & Josh | PSL | Yes | Installing SPI optics in PSL | 19:58 |
17:45 | FAC | Tyler | YARM backside | n | Check well line | 18:35 |
17:46 | SPI | Keita | OpticsLab | YES | Helping with PSL SPI work | 20:26 |
17:58 | SPI | Jeff | Optics Lab | yes | working on SPI optics | 18:31 |
18:02 | HAM1 | Sheila | LVEA HAM6 | N | Looking for parts | 18:11 |
18:16 | VAC | Travis | LVEA | n | Looking for Marristat bags | 18:26 |
19:30 | PCAL | Tony | PCAL Lab | Yes | transfer standard Measurement config change | 19:37 |
19:48 | HAM1 | Betsy & Travis | LVEA | N | HAM1 feed throughs | 21:22 |
19:52 | HAM1 | Mitchel & Randy | LVEA HAM1 | N | Installing HAM1 ISI accessories, Mitchell out Early | 21:25 |
20:01 | SEI | Jim | LVEA | N | Plugging in HAM1 Electronics | 22:47 |
20:02 | Vac | Janos & Jordan | LVEA | N | Prep turbo pumps for pump down | 20:34 |
20:24 | EE | Fil | LVEA | N | Workign on Feed Through with Betsy & Travis | 21:27 |
20:33 | SEI | Jennie, Edgor, Sina | LVEA | N | Taking a look at the HAM1 Work | 20:50 |
20:35 | SPI | Josh | Optics Lab & PSL | YES | Optics work for SPI system | 21:00 |
20:46 | PSL | Ryan S, Sina, Josh | PSL | Yes | SPI pickoff beam path from PSL | 00:01 |
20:59 | Safety | Richard | LVEA | N | Safety Checks | 21:10 |
21:01 | FAC | Tyler | LVEA | N | Checking on HVAC in Southbay | 21:09 |
21:09 | SUS | Ryan C & Rahul | LVEA HAM6 | N | Dropping off SUS & Optics | 21:14 |
21:10 | IAS | Jason | LVEA | N | Aligning | 21:58 |
21:16 | IAS | Ryan C | LVEA | N | Surveying | 21:58 |
21:29 | VAC | Jordan | Mid X&Y | N | Cap. Inventory | 21:51 |
21:32 | FAC | Eric | Water Tank | N | Resetting water Tank water level sensor | 22:17 |
21:52 | VAC | Jordan | LVEA | N | Turbo pump checks | 22:39 |
22:50 | Vac | Janos & Jordan | LVEA | N | Starting Pump Down | 01:50 |
23:36 | IAS | Jason | LVEA | N | Unplugging battery | 23:40 |
23:42 | Pcal | Tony | PCAL Lab | Yes | Checking PCAL config | 23:47 |