TITLE: 04/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 5mph Gusts, 3mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.20 μm/s
QUICK SUMMARY:
VAC team have been Pumping down the corner station volume for 15 hours now and H0:VAC-LX_Y2_PT180_MOD1_PRESS_TORR channel is reporting that we are below 200 torr in BSC8 chamber.
Expected work today: