Displaying report 1-1 of 1.
Reports until 16:48, Thursday 17 April 2025
H1 General
anthony.sanchez@LIGO.ORG - posted 16:48, Thursday 17 April 2025 (83987)
Thursday OPs Report.

TITLE: 04/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
The Vacuum team has been hard as work removing the air from the corner station. We seem to be below 20 torr.
The SPI team has Finished putting in their pickoff inside the PSL.
The SEI team workin on HAM1 still has more work to do.
SUS team has been cleaning optics in the Mega chamber as well

Also:
19:30 Hanford site called the LHO control room to let us know that they were performing a Take Cover Drill. The Operator Core decided to go over the protocol for shutting off the HVAC system in the case that this was not a drill.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:45 FAC Nellie &  Kim LVEA NO Technical Cleaning 16:45
15:27 VAC Jordan LVEA N Resuming pumpdown 16:03
15:35 FAC Tyler LVEA N Putting compass stickers on cranes 16:47
15:44 Plant Study H Miss. cont Mid X N Studying plants? 17:11
15:47 PCAL Tony PCAL Yes Transfer standard PCAL measurement 15:57
15:58 SEI Jim LVEA Racks n checking ADC cabling 19:28
16:01 FAC Randy & Mitchel LVEA N Moving equipment & machines Started ~16:09 18:35
16:10 CDS Dave B Remote N Model & DAQ restart 16:19
16:12 SPI Sina & Ryan S LVEA Yes Installing SPI Pickoff 19:16
16:13 EE Daniel LVEA racks N Running Cabling 21:01
16:14 EE Marc LVEA N Running Cables with Daniel 23:24
16:17 SEI Jim LVEA HAM1 N Working on in air side feed throughs on HAM1 16:20
16:19 SPI Josh Optics Lab & PSL Yes Working on Optics for SPI With Escort Jeff. 19:16
16:48 EE Fil LVEA N Cabling for HAM1 with Daniel & Marc 23:24
17:02 FAC Kim LVEA n Vacuuming in MSR 17:32
17:04 PSL Jason PSL Yes Helping out with SPI 18:56
17:22 SUS Rahul & Ryan C LVEA HAM6-7 N First contact of triple suspensions. 18:14
18:09 VAC Janos & Jordan HAM6 area N Checking Guages and Valves 20:24
18:42 Sun Ryan C Y arm n Taking a walk down Y arm. 19:15
18:46 HAM1 Camilla LVEA N Retreiving Parts. 18:53
19:38 OPS Tony, Ibrahim, Ryan C, Oli, TJ, Ryan S, Eric Mechanical Room N Hanford Radiation Emergency Drill Respons 19:39
20:25 VAC Jordan LVEA HAM4 N Setting up pump on HAM4 Annulus & Cap Inventory Checks 22:28
20:39 SPI Ryan S, Sina, Josh PSL Yes Installing SPI Pickoff 22:00
20:54 VAC Travis & Janos HAM4 Area N Vacuum pump activities 21:59
21:02 SUS Rahul, Ryan C LVEA HAM6 N cleaning Tripple SUS optics. 22:14
21:07 Saftey Richard LVEA N Safety checks 21:24
21:29 SEI Jim LVEA HAM1 N Restarting HAM 1 SEI Systems 22:28
22:00 Prop Travis End X &Y N Property inventory 22:37
22:14 SEI Jim CER N Checking SEI Config 00:14

 

Images attached to this report