J. Kissel scribing for S. Koehlenbeck, J. Freed, and R. Short ECR E2400083 IIET 30642 WP 12453 Just writing a separate explicit aLOG for this for ease of reference in the future. Before, during and after the SPI install we measured power along respective paths, (1) The p-pol in-coming power into the whole ALS / SQZ / SPI pick-off path, (2) The "ALS COMM" path: p-pol power in transmission of the ALS-PBS01 with the newly modified ALS-HWP2 position to get more power total power in the paths (3) and (4), (3) The "SPI pick-off" path: The ~s-pol power in reflection of SPI-BS1, (4) The "ALS/SQZ Fiber Distribution" path: ~s-pol power in transmission of SPI-BS1, (see discussion in LHO:83978 as to why we're not so confident the reflection from ALS-PBS01 is entirely s-pol, which is why I say "~s-pol" here.) The BEFORE vs. AFTER power in these paths is as follows: Path Measured Between Raw Power [mW] PMC TRANS [W] Date/Time Measured Scaled Power [mW] Fractional Power [%] (1) ALS-L1 and ALS-HWP2 2060 103.2 2025-04-15 21:39 UTC 2095.9 --- % BEFORE (2) ALS-M2 and ALS-L2 1970 102.8 2025-04-15 22:17 UTC 2012.2 96% (4) ALS-M9 and ALS-FC2 48.7 103.0 2025-04-15 21:48 UTC 49.646 2% % AFTER (2) ALS-M2 and ALS-L2 1790 103.3 2025-04-17 21:13 UTC 1817.7 87% (3) SPI-L1 and SPI-L2 186 103.5 2025-04-16 22:43 UTC 188.7 9% (4) ALS-M9 and ALS-FC2 50.5 103.5 2025-04-16 22:43 UTC 51.232 2% where I've scaled all the raw power measurements by the rough nominal PMC TRANS power during recent observing times, 105 [W], i.e. (Scaled Power [mW]) = (Raw power) * (105 [W] / PMC TRANS [W]) and (Fractional Power [%]) = 100 * {Scaled Power [mW]; paths (2)-(4)} / {Scaled Power [mW]; path 1} As Ryan mentions in LHO:83989, for the purposes of safe long term storage, after all was said and done, we rotated SPI-HWP1 such that only 20 [mW] would go toward the SPI-FC1 fiber collimator, and it's dumped upstream just after SPI-L1. These AFTER power levels are what we anticipate running the rest of O4 in, with the SPI pick-off path safely out of commission. 2W Measurements Head: Ophir 10A-V2-SH SN122042 Readout: Ophir 20C-SH SN171175 Accuracy: +/-3% 200 mW Measurements: Head: Thorlabs S401C Readout: Thorlabs PM100-D Accuracy: +/- 7% The attached picture summarizes all this info. The picture was take midday 2025-04-17, so you see the Ophir power meter in the middle of the ALS COMM