marc.pirello@LIGO.ORG - posted 16:35, Friday 18 April 2025 - last comment - 16:56, Friday 18 April 2025(83999)
HAM 1 Cabling Complete

Finished dressing and installing cables for the new feedthroughs on HAM1. 

First we powered off the ISI interface and coil drivers for HAM1, disconnected all SEI cables from HAM1, redressed and reconnected them.  Next we dressed all HAM1 RF cables and installed to feed throughs.  We installed shrink tube to isolate the SMA connectors from each other.

All DSUB RM1, PM1, and ISC cables are reconnected.

There is a missing cable tray still to be dressed along the D6, D5, D4 side of HAM1.  Cables are temporarily dressed in this area, awaiting tray installation.  All SEI electronics remain off.

D. Sigg, F. Clara, M. Pirello

 