TITLE: 04/21 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
HAM Team1 has said "We managed to suspend HEPI on HAM1, but are still doing initial alignment so the mechanical stops are disengaged. The whole stack is just on springs, so running into the crossbeams could damage the bellows if done with enough exuberance. Don't do that. "
Norco Contractor arrived at at 17:20 UTC
Model resart H1ASC H1LSC starting at 19:50 UTC
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:46 | VAC | Jordan | LVEA | N | Purge Air Checks. | 14:59 |
14:58 | FAC | Kim | LVEA | N | Technical Cleaning | 16:58 |
16:17 | IAS | Jason & Ryan | LVEA HAM1 | N | Setting up for alignment. | 17:59 |
16:19 | CDS | Johnathan | MSR | No | Installing & Spinning up AUX Frame writer | 18:19 |
16:20 | FAC | Randy | LVEA | N | Helping HAM1 Alignment work | 18:47 |
16:32 | VAC | Jordan & Janos | LVEA +X | N | Leak checking | 18:32 |
16:33 | Safety | McCarthy | LVEA | N | Safety Checks | 17:33 |
16:47 | SEI | Jim | LVEA HAM1 | N | Aligning HAM1 | 18:47 |
16:48 | SEI | Mitchel | LVEA HAM1 | N | HAM1 Aligning & Installing | 18:40 |
17:13 | EE | Fil | LVEA & Mids | N | Capitol Inventory | 19:12 |
17:26 | FAC | Kim | HAM Shaq | N | Technical Cleaning | 18:32 |
17:44 | ISC | Camilla & Jennie W | LVEA | N | Swapping Beam dumps from glass to metal. | 19:32 |
18:43 | PCAL | Tony | PCAL Lab | YES | Move Power sensors | 18:52 |
19:11 | VAC | Jordan | LVEA & Ends | N | Annual inspect of Dewers Site Wide | 17:11 |
19:13 | EE | Fil & McCarthy | LVEA | N | Satelite check | 19:43 |
19:32 | SEI | Randy , Mitchel, Jim | LVEA HAM1 | N | Aligning and installing ISI | 22:13 |
20:51 | ISC | Camilla | LVEA | N | First contacting optics | 21:36 |
20:53 | FAC | Tyler | Ham Shaq area | N | De-tumble weeding | 22:25 |
21:14 | ISC | Ryan | LVEA | N | Helping Camilla | 21:21 |
21:15 | Safety | McCarthy | LVEA | N | Looking for Fil | 22:00 |
21:22 | VAC | Janos & Jordan | LVEA | N | Vacuum Work | 01:22 |
22:01 | EE | Tony, Fil | PCAL Lab | y(local) | Checking if SR95 for Fil is in there | 22:57 |
22:18 | IAS | RyanC, Jason | LVEA | n | Alignment work | 00:18 |
22:45 | ISC | Camilla & Jennie | LVEA | N | First contacting | 23:05 |
22:49 | VAC | Gerardo | LVEA & Ends | N | Capitol eye Inventory | 00:49 |