SEI at EX tying up loose ends IAS at ITMX taking a shot of position Work on the ISS PD Array Close GV6 for vacuum work Move SEI storage containers to mid station PSL crashed, brought up partially but the ref cav is not locked Waste removal was on site Roofers continued Cryopump baffle needs mod