Reports until 07:32, Tuesday 22 April 2025
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:32, Tuesday 22 April 2025 (84043)
OPS Day Shift Start

TITLE: 04/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 7mph Gusts, 5mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.20 μm/s
QUICK SUMMARY:

IFO is in PLANNED ENGINEERING for the vent.

Some of today's planned maintenance:

Work safe!