TITLE: 04/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
IFO is in PLANNED ENGINEERING for the VENT
Productive day in which the following was completed:
The Trello has been updated to reflect the changes.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:37 | FAC | Kim | LVEA, Optics, Vac Prep | N | Technical cleaning | 15:35 |
15:05 | FAC | Chris, Eric | MY, EY, MX, EX | N | Checking filters, greasing fans | 18:58 |
15:20 | VAC | Jordan | LVEA | N | Purge air checks | 15:34 |
15:36 | Camilla | LVEA | N | Tidying up | 17:26 | |
16:04 | IAS | Jason, RyanC | LVEA | N | HAM1 IAS | 17:07 |
16:04 | PSL | Ryan S | LVEA | N | Picometer cable swap | 17:44 |
16:06 | SEI | Mitchell, Jim | LVEA | N | HAM1 Work Contd. | 18:50 |
16:37 | FAC | Tyler | MY, MX, EY, EX, LVEA | N | Installing compasses on cranes | 21:22 |
16:39 | PSL | Fil | LVEA | N | Picomotor cable swap | 17:30 |
16:56 | FAC | Kim | LVEA | N | Technical cleaning | 17:16 |
17:30 | EE | Fil | EX | N | Beckhoff troubleshooting | 18:35 |
17:32 | VAC | Janos | LVEA | N | Opening GV2 | 18:50 |
17:32 | VAC | Gerardo | LVEA | N | Opening GV2 | 18:50 |
17:40 | VAC | Travis | LVEA | N | Opening GV2 | 19:18 |
19:16 | Jeff | Optics Lab | N | Experiment setup | 20:54 | |
20:18 | VAC | Travis | LVEA | N | Rougher work | 01:17 |
20:22 | EE | Marc, Daniel | LVEA | N | TDR Measurements | 22:10 |
21:14 | PCAL | Rick, Tony | EX | N | EX Calibration measurement | 00:13 |
21:22 | EE | Fil | EY | N | BRS Work | 00:22 |
22:48 | SAF | Richard' | LVEA | N | Walkabout | 00:48 |
23:34 | VAC | Janos | LVEA | N | Walkabout | 00:34 |