Reports until 16:42, Thursday 24 April 2025
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:42, Thursday 24 April 2025 (84114)
OPS Day Shift Summary

TITLE: 04/24 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

IFO is in PLANNED ENGINEERING for VENT

Productive day where most of the work was spent on HAM1 cabling, followed by RM1 install.

Of note:

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:39 FAC Kim LVEA N Tech clean 15:52
14:39 FAC Nellie LVEA N Tech clean 15:52
15:45 VAC Jordan LVEA N Purge air checks 16:03
15:45 SUS Betsy LVEA N Cabling HAM1 18:59
15:52 FAC Nellie H2 N Tech clean 16:07
16:07 SUS Randy YARM N QUAD Moving 23:24
16:33 SUS Richard LVEA N Cabling/H.O.R.S.E. 17:03
16:50 SUS Mitchell EX, EY n FAMIS tasks 22:50
16:56 SUS Travis LVEA N Cabling 17:06
17:07 FAC Kim, Nellie MY, MX N Tech clean 18:51
17:53 VAC Jordan MX, MY N Emergency Pump Survey 18:38
17:53 VAC JaNos MX,MY N Emergency Pump Survey 18:37
18:23 ISC Camilla, Matt LVEA N Measuring viewport heights 18:54
18:39 PCAL Tony PCAL Lab N TSA to France + stickers 20:07
19:01 SUS Jim LVEA N Cabling 23:00
19:31 FIT Ryan C LVEA N Respiratory and Perspiratory Regulation Test (Walk) 20:04
19:56 ISC Matt, Rahul, Camilla, Oli LVEA n HAM1 ISC installation 23:23
19:59 VAC Jordan MY, MX N Turbo Pump Checks 22:50
20:00 SUS Betsy LVEA, Opt Lab N Walkabout + Feed Through Cable Work 21:56
20:03 VAC Travis Opt Lab N Feedthru Cable Work after turning compressor off 22:48
20:19 VAC Janos LVEA N VAC checks 20:28
20:41 CDS Fil, Dave FCES N HAM8 Post Outage Glitch 22:59
21:07 VAC Vacuum Convoy YARM N Beam Tube Experiment Walkabout 21:56
21:49 PCAL Tony PCAL N Measurements and general lab affairs 22:22
22:59 EE Fil HAM1 N helping Rahul 23:24
23:24 SUS Betsy. Fil, Rahul, Daniel LVEA N RM1 Things 23:40