Oli, Matt, Camilla
Late entry, Jim and I worked the last few half days to lace up all of the cabling for SUS, SEI, and IO/ISC in prep for the main reinstall of table components. Fil, some Richard, and I did preliminary ground loop checks on all SUS and IO/ISC cables so we have a handle on the situation before complicating with components. I routed cables on the table top in an attempt to be near where things plug in but also not in the way of landing objects. Further dressing and coiling will be needed after troubleshooting plugins with components as we go. Pics of the pre round of cabling.
Oli, Camilla
This morning we swapped the direction of HW1 so that it is facing the same as before. We also placed L2, M15, LSC POP A and ASC POP X although the diodes are not cabled up yet. They can be next week as Daniel confirmed chassis are powered off.
ASC POP X is new, the box is marked D1102004-v6 S/N 016 S1300637, ICS link. Have added this to the D1000313 BOM googledoc and HAM1 ICS assembly.
Tagging with EPO to document the process.