Reports until 07:47, Friday 25 April 2025
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:47, Friday 25 April 2025 (84118)
OPS Day Shift Start

TITLE: 04/25 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 1mph Gusts, 0mph 3min avg
    Primary useism: 0.06 μm/s
    Secondary useism: 0.09 μm/s
QUICK SUMMARY:

IFO is in PLANNED ENGINEERING for VENT

Some planned tasks for today:

Work safe!