Reports until 21:24, Wednesday 06 November 2013
H1 AOS
nichole.washington@LIGO.ORG - posted 21:24, Wednesday 06 November 2013 (8413)
OFI Staging for assembly x2 (H1 and L1)
Scott Shankle, Nichole Washington

Cleanroom in LVEA West Bay has been staged for assembly of OFI for H1 and L1. Two tables will be moved into cleanroom via Jodi. Laminated drawings, assembly instructions and parts are in bins curbside cleanroom. All parts curbside placed in ICS storage-6963. Additional parts to be wrapped at the VPW. An OMC/OFI structure and braces are located in receiving. The OFI blades and small electropolished parts are located in Thomas Vo's office. The structure, braces, blades and small parts require transport to VPW for Class A cleaning.

Mike Vargas is shipping all clean parts, hardware, tooling and tools currently at LLO to LHO.

 
Images attached to this report