TITLE: 04/25 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: The HAM1 work continued today, the RMs are back in.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:50 | FAC | Kim | LVEA | N | Tech clean | 17:42 |
14:50 | FAC | Nellie | LVEA | N | Tech clean | 17:43 |
16:15 | SUS | Rahul | LVEA HAM1 | N | RM1 Cabling Check | 19:15 |
16:27 | Oli | LVEA | n | Check if Rahul needs help | 16:43 | |
16:55 | SUS | Jim | LVEA | N | HAM2 L4C 3 Inspection | 18:37 |
16:55 | FAC | Richard | LVEA | N | HAM1 Cable Work | 19:36 |
16:55 | SUS | Betsy | LVEA | N | Cable Work | 19:33 |
16:56 | FAC | Randy | LVEA | N | Cable work and misc | 19:56 |
17:32 | ISC | Oli, Camilla | LVEA | N | ISC HAM1, Camillla out @ 19:28 | 19:30 |
17:48 | VAC | Gerardo | LVEA | N | Vacuum Checks | 18:08 |
17:53 | CDS | Dave | FCES | N | Power Cycling HAM8 (FC2, ISI) | 19:54 |
18:04 | PCAL | Francisco | PCAL | N | Integrating sphere cover | 18:14 |
18:05 | EE | Fil | LVEA, MY | N | Inventory | 19:54 |
18:08 | PEM | RyanC | EndY | N | Dust monitor flow check/test | 19:05 |
19:33 | SUS | Rahul | Remote | N | RM1 & 2 measurements | 20:12 |
20:58 | SUS | Rahul | LVEA | N | HAM1, RM checks | 21:41 |
20:58 | SUS | Betsy | LVEA | N | Help with HAM1, checks | 21:35 |
21:00 | ISC | TJ, Oli, Camilla, Raed | LVEA | N | Put IOT2L back in place | 21:41 |
21:03 | ISC | Keita | Optics lab | N | Search for parts/optics | 21:13 |
21:09 | SAF | Richard | LVEA | N | Check with HAM1 crew | 21:35 |
23:22 | VAC | Gerardo | LVEA | N | Preweekend checks | 23:45 |