TITLE: 04/28 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
IFO is in PLANNED ENGINEERING for VENT
Short summary of work done:
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:44 | FAC | Kim | LVEA | N | Tech clean | 15:48 |
14:44 | FAC | Nellie | FAC | N | Tech clean | 15:48 |
14:44 | FAC | Tyler | YARM | N | Boom Lift to EY | 15:20 |
15:51 | FAC | Randy, Tyler, Betsy, TJ, Mitchell | LVEA | N | Moving Optics Table | 16:47 |
16:07 | SUS | Camilla | LVEA | N | Moving Optics Tables | 18:39 |
16:24 | ISC | Oli | LVEA | N | HAM1 ISC install | 17:50 |
16:42 | PCAL | Tony | PCAL Lab | N | PCAL Meas. | 18:39 |
16:48 | FAC | TJ | LVEA | N | Moving Optics Table | 17:53 |
16:48 | SUS | Rahul | LVEA | N | HAM1 RMs | 18:01 |
16:56 | VAC | Jordan | LVEA | N | Purge Air Checks | 16:56 |
17:01 | FAC | Nellie | Water Pump | N | Tech cleaning | 17:25 |
17:01 | EE | Marc | LVEA | N | Ground loop help | 17:45 |
17:05 | AOS | Elenna | LVEA | N | Wipe drop | 17:05 |
17:26 | FAC | Nellie | LVEA | N | Tech clean | 18:48 |
17:26 | FAC | Kim | LVEA | N | Tech clean | 18:48 |
17:44 | VAC | Jordan, Gerardo | MX, MY | N | Dewar jack pump work | 20:33 |
17:45 | EE | Fil, Marc | LVEA | N | HAM1 Table Cable | 19:26 |
18:52 | PCAL | Tony | PCAL Lab | y(local) | TSA measurement | 19:52 |
20:22 | PCAL | Tony | PCAL Lab | N | Computer power off | 21:34 |
20:33 | PSL | Jason | LVEA | N | Locking rotation stage | 20:42 |
20:35 | ISC | Camilla, Oli | LVEA | N | HAM1 ISC Cabling | 22:48 |
20:36 | VAC | Jordan, Gerardo | LVEA | N | RGA Stand | 22:18 |
21:34 | TCS | TJ, Matt | LVEA | N | TCS Table Looksy | 22:12 |
22:25 | SUS | Rahul | LVEA | N | HAM1 Work | 23:07 |
22:52 | CDS | Fil | MR | N | Beckhoff computer power | 01:52 |
23:03 | VAC | Jordan | MY | N | Turning off dewar pump | 23:23 |
23:22 | EE | Marc | MY | N | Part search | 02:22 |