LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:32, Monday 28 April 2025 (84156)
OPS Day Shift Summary

TITLE: 04/28 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

IFO is in PLANNED ENGINEERING for VENT

Short summary of  work done:

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:44 FAC Kim LVEA N Tech clean 15:48
14:44 FAC Nellie FAC N Tech clean 15:48
14:44 FAC Tyler YARM N Boom Lift to EY 15:20
15:51 FAC Randy, Tyler, Betsy, TJ, Mitchell LVEA N Moving Optics Table 16:47
16:07 SUS Camilla LVEA N Moving Optics Tables 18:39
16:24 ISC Oli LVEA N HAM1 ISC install 17:50
16:42 PCAL Tony PCAL Lab N PCAL Meas. 18:39
16:48 FAC TJ LVEA N Moving Optics Table 17:53
16:48 SUS Rahul LVEA N HAM1 RMs 18:01
16:56 VAC Jordan LVEA N Purge Air Checks 16:56
17:01 FAC Nellie Water Pump N Tech cleaning 17:25
17:01 EE Marc LVEA N Ground loop help 17:45
17:05 AOS Elenna LVEA N Wipe drop 17:05
17:26 FAC Nellie LVEA N Tech clean 18:48
17:26 FAC Kim LVEA N Tech clean 18:48
17:44 VAC Jordan, Gerardo MX, MY N Dewar jack pump work 20:33
17:45 EE Fil, Marc LVEA N HAM1 Table Cable 19:26
18:52 PCAL Tony PCAL Lab y(local) TSA measurement 19:52
20:22 PCAL Tony PCAL Lab N Computer power off 21:34
20:33 PSL Jason LVEA N Locking rotation stage 20:42
20:35 ISC Camilla, Oli LVEA N HAM1 ISC Cabling 22:48
20:36 VAC Jordan, Gerardo LVEA N RGA Stand 22:18
21:34 TCS TJ, Matt LVEA N TCS Table Looksy 22:12
22:25 SUS Rahul LVEA N HAM1 Work 23:07
22:52 CDS Fil MR N Beckhoff computer power 01:52
23:03 VAC Jordan MY N Turning off dewar pump 23:23
23:22 EE Marc MY N Part search 02:22