Displaying report 1-1 of 1.
Reports until 16:30, Wednesday 30 April 2025
H1 General
ryan.crouch@LIGO.ORG - posted 16:30, Wednesday 30 April 2025 (84192)
OPS Wednesday DAY shift summary

TITLE: 04/30 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: The vent work continues...
LOG:                                                                                                                                                                                                                                                           

Start Time System Name Location Lazer_Haz Task Time End
14:51 FAC Kim & Nellie LVEA Y Tech clean 15:54
15:21 ISC Camilla LVEA Y Put up/prep hazard signs 15:54
15:38 VAC Jordan LVEA Y Purge air checks 15:56
15:45 ISC Keita LVEA Y Open PSL light pipe 15:49
15:54 FAC Kim MidX N Tech clean 17:00
15:54 VAC Travis MidX, EndX N Turbo monthly checks 18:48
15:54 FAC Nellie MidY N Tech clean 16:58
16:11 FAC Jim, Mitch, Randy EndY N Wind Fence work 22:12
16:34 ISC Camilla, Keita, Elenna LVEA Y HAM1 alignment work, Elenna out 1800UTC 19:31
16:59 VAC Jordan MidY N CP3 pump check 17:17
17:01 FAC Kim FCES N Tech clean 17:38
17:27 SAF Richard LVEA Y Safety checks 17:44
17:48 ISC Oli LVEA Y Join HAM1 alignment crew 19:32
18:28 VAC Janos LVEA N VAC checks 19:09
18:49 FIT Ibrahim Yarm N Walking 19:42
20:32 CAL Tony PCAL lab LOCAL Switch spheres 21:47
20:35 ISC Camilla, Keita LVEA Y HAM1 alignment Ongoing
20:38 ISC Oli LVEA Y HAM1 work Ongoing
21:49 VAC Gerardo, Jordan LVEA Y HAM6 gauge power cycle 21:56
22:31 VAC Gerardo, Jordan LVEA Y Trace a cable for a HAM6 gauge 22:56
22:37 CAL Tony PCAL Lab LOCAL Sphere swap, measurement 23:11
22:56 VAC Jordan MidY N CP3 pump check 23:29
22:55 OPS TJ Garb room N Grab something 22:57

RM troubleshooting alog84204

EY wind fence continues

HAM1 alignment continues

Vacuum gauge work by HAM6

Displaying report 1-1 of 1.