Reports until 16:30, Thursday 01 May 2025
H1 General
ryan.crouch@LIGO.ORG - posted 16:30, Thursday 01 May 2025 (84223)
OPS Thursday day shift summary

TITLE: 05/01 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Vent work continues, more HAM1 alignment and beam profiling today.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:08 FAC Nellie, Kim LVEA Y Tech clean 16:24
15:17 OPS Camilla LVEA Y Tidy up HAM1 area 15:42
15:26 VAC Jordan LVEA Y Purge air and pumps check 15:51
15:30 FAC Randy, Mitch, Jim EndY Y Wind Fence work 16:35
15:30 FAC Corey EndY N Wind Fence work 16:35
16:02 EPO Mike, Amber + Cleo Abram & Crew LVEA Y Tour of the LVEA, Mike out 1800 18:32
16:14 CAL Tony PCAL lab LOCAL Measurement prep/check 16:20
16:33 ISC Camilla Optics lab -> LVEA Y Move stuff over, HAM1 work 19:39
16:34 VAC Jordan MidY N Check on CP3 17:46
16:39 ISC Betsy LVEA Y Join crew 16:54
16:39 VAC Janos LVEA Y VAC pump adjustments 16:50
16:42 EPO Maggie LVEA Y Join tour crew 18:32
16:54 ISC Jennie LVEA Y Help Camilla, HAM1 work 19:39
16:57 FAC Corey, Jim, Randy, Mitch EndY N Wind fence work 19:05
17:08 ISC Daniel LVEA Y Electronics rack work, REFL 18:17
17:11 ISC Betsy LVEA Y HAM1 checks 18:10
17:20 SAF Richard LVEA Y Safety walk 17:26
17:56 FAC Kim MidX N Pest traps 18:29
18:55 VAC Jordan LVEA Y Viewport covers 19:32
19:56 FAC Corey, Jim, Mitch, Randy EndY N Wind fence work 22:05
20:11 EE Fil LVEA Y HAM1 cabling checks, outside chamber 23:01
20:27 EE Marc LVEA Y HAM1 cabling 23:01
20:32 VAC Janos, Jordan LVEA Y IM pumps 20:44
20:39 CAL Tony PCAL lab LOCAL Sphere swap 20:49
20:45 ISC Jennie, Camilla(out), Keita, Betsy(out), Daniel(out), Elenna LVEA Y HAM1 work, Betsy out 21:40, Camilla Daniel out 22:00 Ongoing
22:11 FAC Richard LVEA Y Safety checks 22:23