daniel.sigg@LIGO.ORG - posted 12:04, Thursday 01 May 2025 - last comment - 16:41, Thursday 01 May 2025(84224)
Testing photodetectors in HAM1

I was using the RF test input to test the response of the photodetectors in HAM1.

LSC-POP_A, LSC-REFL_A, LSC-REFL_B are working as expected after swapping the cables at the patch panel for Test-Out and RF1.

ASC-REFL_A was working as expected.

ASC-REFL_B showed no response.

ASC_POP_X looks like the RF cables may be switched.

Comments related to this report
daniel.sigg@LIGO.ORG - 15:13, Thursday 01 May 2025 (84226)

Swapped the coax cables on POP-X and it is working as expected now.

We did flash light tests on all detectors and were able to observe DC shifts on all detectors. LSC REFL_A and POP_A were swapped. This is a wiring diagram error and the in-air d-subs were swapped at the vacuum feedthrough.

daniel.sigg@LIGO.ORG - 16:41, Thursday 01 May 2025 (84229)

We measured the current draw of ASC REFL_A and REFL_B, they are very similar to each other and close to the values measured in the test procedure.

Still no RF transfer functions for REFL_B.