Reports until 16:36, Tuesday 06 May 2025
LHO General
thomas.shaffer@LIGO.ORG - posted 16:36, Tuesday 06 May 2025 (84297)
Ops Day Shift End

TITLE: 05/06 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: EX wind fence work and more HAM1 beam measurements were the main activites today. PM1 is now on table and hooked up. Sensor correction has been turned on for the corner station by taking SEI_ENV to LIGHT_MAINTENANCE_WINDY.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:07 SAF LVEA is Laser HAZARD LVEA YES LVEA is Laser HAZARD 07:07
14:35 FAC Chris EX, MX, EY, MY N Searching for lift 16:01
14:57 FAC Kim, Nellie LVEA - Technical cleaning 17:21
15:35 VAC Jordan LVEA - Purge air and pump checks 17:17
15:49 SEI Jim, Mitchell EX N Wind fence work 18:49
16:01 FAC Chris LVEA - FAMIS checks 16:20
16:09 EE Jackie FCES N Looking for oscilloscope 18:09
16:20 FAC Chris, Pest Ctrl. LVEA, EX, MX, EY, MY - Checking traps 17:27
16:23 FAC Ken LVEA - HAM4/5 cable trays 23:00
16:24 CDS Fil LVEA - Electronics install in HAM6 racks 18:34
17:12 ISC Camilla, Oli LVEA YES HAM1 beam alignment 19:44
17:21 FAC Kim, Nellie FCES N Technical cleaning 18:20
17:28 OPS RyanC OptLab N Checking dust monitor 17:49
17:33 FAC Tyler LVEA - HEPI elbow removal 17:47
17:39 ISC Sheila LVEA YES Joining HAM1 crew 18:51
18:03 ISC Keita LVEA YES Joining HAM1 crew 18:33
18:05 VAC Travis LVEA - Dropping off parts 18:13
18:06 CAL Tony PCal Lab Local Starting measurement 18:22
18:20 ISC Betsy, Elenna LVEA - Checking in with HAM1 crew 18:33
18:48 FAC Nellie MY N Technical cleaning 19:19
18:50 OPS RyanC CER, LVEA - Looking for box to restart 19:38
19:57 VAC Travis MX N Work on roughing pump 21:12
19:59 CDS Dave CER - Power cycling dust monitor box 20:08
20:07 TCS TJ LVEA - Picture of TCS table 20:22
20:15 SUS Rahul LVEA - PM1 install 21:49
20:16 SEI Jim, Mitchell, Corey, Randy EX N Wind fence work 22:14
20:16 CDS Dave EY N PEM sensor install 22:16
20:48 OPS RyanC CER - Restart dust monitor contoller box 21:05
21:10 ISC Elenna, Keita LVEA YES HAM1 beam profiling (Keita out 2242) ongoing
21:14 VAC Travis, Camilla LVEA - Turning down purge air (Travis out 21:18) 21:21
21:30 - Matt, grandparents LVEA yes Tour 22:05
21:31 SUS Oli LVEA yes Checking on RM offset directions 21:51
21:47 PCAL Tony PCAL lab yes Swap spheres 21:57
21:54 CDS Marc LVEA yes Checking connector fitment 22:14
22:22 ISC Camilla LVEA YES HAM1 work ongoing
22:52 ISC Oli LVEA YES Energizing rotation stage 23:12