TITLE: 05/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: LIGHT_MAINTENANCE_WINDY
Wind: 6mph Gusts, 3mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.11 μm/s
QUICK SUMMARY:
LVEA is LASER HAZARD
The Expected work to day is probably :
- More Wind Fence work
- HAM 4 & 5 Cable Tray Work that may use some craning
- LASER HAZ work for PSL_IN@200mW for initial beam path alignment work.
- CDS work: h1iopseih16, h1pslfss, h1sushtts
- Viewport simulator on HAM1
- ~Install PM1, cable up, start troubleshooting, ground checks
- X-ARM PEAK for ALS Beam alignment in HAM1
- HAM1 RM1 troubleshooting ground - alog missing pin 1
- Troubleshoot and Ground checks of LSC/ASC diode boxes
- CDS PEM work
- Are we done Peeking down x arm? Should we close the GV?