Reports until 19:15, Thursday 07 November 2013
H1 AOS (SEI, SUS)
jason.oberling@LIGO.ORG - posted 19:15, Thursday 07 November 2013 (8434)
WBSC3 ITMx & ACB Alignment

Two-fer tonight

ITMx Alignment

IAS: D. Cook, J. Oberling
SEI: H. Radkins, G. Grabeel, M. Robinson
 
Aligned the yaw of the ITMx and took a pitch measurement.  Position alignment remains unchanged from alog 8403.

IAS is now on hold until the HEPI actuators are attached; we will then take another look.  At some point after that we will have to do a small pitch correction.

ITMx ACB Alignment

IAS: J. Oberling
SLC: T. Vo
 
Aligned the ITMx ACB laterally and vertically tonight.  The errors are as follows:

All is within spec and good to go.