Friday Afternoon ops Report.

TITLE: 05/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Bees:
There is a box potentially full of bees sat right next to a spool of wire and a chair at EX as the Bee keeper is trying to remove the beehive from the wire spool.
There is still a bee swarm near the gate as well.
 

HAM1 work:
The IST1 table has been moved back into place.
GV7 has been soft closed.
Rahul took some SUS transfer functions to check for rubbing.
Laser power was turned up at the Request of Camilla & Sheila to aid in finding the IR beam spot alignment on to the ISCT1 table.

Wind fence:
Wind fence team got another set of cables strung up for the WindX work down at End X 

GRB-Short E570982 @ 22:34:04 UTC
GRB-Short 570981 @ 22:35:15 UTC

Oli & Camilla took the Laser power back down to 2W for trhe night at 23:39 UTC. 

LVEA is still LASER hazard.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:07 SAF LVEA is Laser HAZARD LVEA YES LVEA is Laser HAZARD 07:07
14:58 Bee Tyler & the BGs End X N Tyler taking the Bee Guy to EX to potentially remove bees 17:36
15:21 FAC Jim, Randy EX N Working on Wind fence & Bees 21:08
15:30 FAC Kim & Nellie LVEA - Technical Cleaning 16:10
15:38 ISC Sheila & Camilla LVEA HAM1 Yes Aligning optics on HAM1 19:30
15:49 SUS Rahul Ham1 N Checking for rubbing on RM1 16:10
15:54 ISC Keita LVEA HAM1 - talking wwith Sheila 19:30
16:25 PEM Robert, carlos , Kiet The Vault in the Desert N PEM install work. 19:58
17:15 HAM1 Betsy LVEA HAM1 n Checking on HAM1 team 18:43
17:32 FCA Tyler LVEA Ham1 N Moving the ISCT1 table back into place. 18:11
19:32 VAC Gerardo Y Travis LVEA +X Arm - Soft closing GV7 20:08
19:47 PCAL Francisco PCAL Lab Yes Finishing up a measurement 19:52
20:19 SUS Rahul Remote N Taking RM SUS TF 21:39
20:32 ISC Keita & Sheila LVEA HAM1 YES Working on IR beam path inside HAM1 00:32
20:42 ISC Jennie W LVEA HAM1 Yes Helping with Beam alignment 22:44
21:39 VAC Gererdo  LVEA Ham2 +X N Decommisioning Optical laver housing 22:20
21:56 PSL Oli LVEA Y Turn up PSL to 20Ws 22:05
21:59 EE Marc MidY N Dropping off parts 22:59
22:05 ISC Camilla LVEA HAM1 Yes Helping with HAM1 work 23:05
23:34 PSL Oli LVEA HAM1 Yes Turning the power back down to 2W 23:54