TITLE: 05/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 1mph Gusts, 0mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.17 μm/s
QUICK SUMMARY: Systems appear to be fully recovered after the h1susb123 crash and output arm turbopump shutoff this weekend. More vent work planned for today includes wrapping up HAM1 alignment and more wind fence work at EX.