TITLE: 05/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
HAM1 Purge air has been turned Down.
HAM1 ISI is Currently Unlocked.
It got too windy to work on the Wind Fence while elevated at EX, so wind fence work was postponed.
SEI BRS team found a broken cable on the BRS System.
TCS team Turned on the Hartman Wave front lasers. These are Eye safe lasers that have a power output of less than a mW. So if you see a blue-green ~780nm beam it MAY be from that.
Bees are still at EX.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:33 | FAC | Randy | EX | N | Wind fence work | 17:46 |
14:45 | FAC | Kim & Nellie | LVEA | N | Technical cleaning | 15:31 |
15:18 | SEI | Corey | EX | N | Wind fence work | 17:46 |
15:52 | EE | MARC | EE LAB | N | Control Room Quiet Time for TEST N EE Lab | 16:52 |
16:02 | Bees | Mitchel | EX | N | Moving a box of Bees | 17:47 |
16:09 | VAC | Jordan | LVEA | N | Purge Air checks. | 16:29 |
16:18 | sei | Jim | Remote | N | HAM1 SEI health checks STAY AWAY | 18:18 |
16:31 | PEM | Robert , Carlos, Keit | EX | N | Getting parts | 16:51 |
16:52 | FAC | Nellie | EY | N | Technical cleaning | 18:12 |
17:53 | SEI | Randy | EX | N | Getting Equipment. | 18:33 |
18:12 | FAC | Nellie | LVEA | N | Technical Cleaning | 19:10 |
19:11 | FAC | Nellie | EY | N | Dropping off supplies | 19:41 |
19:23 | TCS | Camilla | LVEA | No | Turning on an Eyesafe Hartman laser | 19:26 |
19:38 | SEI | Michael R & Shoshana | EY | N | Pumping Down BRS | 20:33 |
19:43 | TCS | Camilla | LVEA | N | Power cycling the Hartman cameras | 19:47 |
19:55 | SEI | Jim | LVEA Ham1 | N | Locking ISI & Adjust CPS | 21:14 |
20:09 | VAC | Jordan | LVEA | N | Looking for parts | 20:18 |
21:08 | VAC | Travis | MidY | N | Looking for Eye bolts | 21:20 |
21:13 | FCA | Mitchell & Randy | LVEA | n | Liberating totes from their resting place | 23:13 |
21:14 | SEI | Jim | LVEA | N | Turned down Purge air | 21:14 |
21:21 | VAC | Travis & Jordan | LVEA | N | Craning over the X arm | 21:49 |
21:42 | TSC | Camilla & TJ | CER | N | Turning on HighVoltage for the Ring Heaters. | 21:46 |
21:50 | Guard | TJ & Olli | Control rm | N | Testing new guardian code | 23:12 |
22:05 | SEI | Michael R & Shoshanna | EY | N | BRS Wiring | 22:40 |
23:18 | VAC | Janos | Mid X&Y | N | Cryo pump survey | 01:18 |