Final Check of Beams through HAM1 Viewports
Betsy, Sheila, Camilla.
WP 12551
After the VAC team installed the +Y door, we got the PSL ALS and REFL beams (opened beam divertor) out of the VPs.
All look good.
Attached photo
of PSL ALS beam,
with expected green arm beams added on from
84338 photo
.
Attached photo
of REFL beam,
with expected POP beam added on from
84361 photo
.