TITLE: 05/19 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Doors are on HAM1 and things are being wrapped up in order to start pumping down!
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:15 | FAC | Kim, Nellie | LVEA | n | Tech clean | 14:58 |
15:20 | VAC | Jordan | LVEA | n | Turning down purge air on HAM1 | 15:27 |
15:51 | Oli | LVEA | YES | Transitioning LVEA to laser hazard | 16:06 | |
15:59 | - | Corey | EX | n | Wallet hunt | 16:19 |
16:00 | FAC | Kim, Nellie | EX | n | Tech clean | 17:08 |
16:11 | OPS | RyanC | LVEA | Y | Restart DM5 | 16:11 |
16:00 | Camilla | LVEA | YES | Turning down power | 16:37 | |
16:00 | SUS | Jeff, Rahul | LVEA | YES | Checking RM pointing (Jeff out 16:40) | 16:43 |
16:00 | EE | Fil | CER | YES | Checking if PM1 is jumpered | 16:14 |
16:39 | EE | Fil | LVEA | n | Running cables | 18:21 |
16:40 | EX | Eric | EX | n | Looking for hot breakers | 17:59 |
16:40 | Camilla | LVEA | YES | Transitioning us back to laser safe | 16:48 | |
16:44 | ISC | Betsy | LVEA | n | Last minute checks on HAM1 table | 17:40 |
16:57 | SUS | Jeff | CER | n | Checking SUS coil drivers | 17:00 |
17:04 | VAC | Travis | LVEA | n | Prepping for doors | 18:34 |
17:09 | FAC | Kim, Nellie | EY | n | Tech clean | 17:50 |
17:09 | PCAL | Tony | PCAL Lab | y(local) | Packing up standards | 18:28 |
17:24 | VAC | Jordan, Janos | LVEA | n | HAM1 doors | 18:41 |
17:26 | VAC | Gerardo | LVEA | n | HAM1 Doors | 18:41 |
17:44 | FAC | Chris | MY | n | Checking noisy bearing | 18:24 |
17:45 | EE | Jackie | LVEA | n | Helping Fil with cables | 18:21 |
17:53 | SUS | RyanC | CR | n | OpLev charge meas for ends | 19:21 |
18:16 | Elenna | LVEA | n | Watching doors get put on | 18:21 | |
18:22 | EE | Fil, Jackie | CER | n | ISC cabling for HAM1 | 19:36 |
18:34 | ISC | Camilla, Betsy | LVEA | YES | Transitioning to Laser Hazard and checking beams at ports | 19:07 |
18:57 | FAC | Nellie | LVEA CERish | YES | Restocking garb | 19:26 |
19:24 | VAC | Jordan | LVEA | N | Door work | 21:51 |
19:33 | VAC | Janos, Gerardo, Travis, Randy | LVEA | n | Putting on second door (Janos, Travis, Randy out 21:30) | 21:51 |
19:44 | FAC | Eric | EY | n | Checking breaker panel temps | 21:16 |
20:15 | CDS | Jonathan, Dave | MSR | n | Swapping frame writer power supply | 20:47 |
20:46 | Jeff | LVEA | n | Returning laptop | 20:48 | |
20:47 | TCS | Camilla | LVEA | n | Checking CO2X table parts (laser is off) | 21:13 |
20:48 | CDS | Dave | EY | n | Checking cameras | 21:56 |
21:13 | PCAL | Tony | PCAL Lab | y(local) | Starting measurement | 22:46 |
21:40 | FAC | Randy | LVEA | n | Helping with doors | 21:51 |
21:46 | EE | Fil | LVEA | n | Finishing up HAM1 cables | 23:34 |
21:46 | Richard | LVEA | n | Trying to not help out | 21:55 | |
21:56 | CDS | Dave | EX | n | Checking other cameras | 22:58 |
22:26 | SEI | Jim, Mitchell | LVEA | n | Moving Class A stuff out of HAM3 cleanroom | 22:43 |
22:41 | VAC | Jordan, Gerardo | LVEA | n | Prepping HAM1 for pumpdown | 23:34 |
23:17 | TCS | Camilla | LVEA | n | Measuring a distance and looking in the TCS cabinets | 23:34 |