Reports until 16:36, Monday 19 May 2025
H1 General
oli.patane@LIGO.ORG - posted 16:36, Monday 19 May 2025 (84474)
Ops Day Shift End

TITLE: 05/19 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Doors are on HAM1 and things are being wrapped up in order to start pumping down!
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:15 FAC Kim, Nellie LVEA n Tech clean 14:58
15:20 VAC Jordan LVEA n Turning down purge air on HAM1 15:27
15:51   Oli LVEA YES Transitioning LVEA to laser hazard 16:06
15:59 - Corey EX n Wallet hunt 16:19
16:00 FAC Kim, Nellie EX n Tech clean 17:08
16:11 OPS RyanC LVEA Y Restart DM5 16:11
16:00   Camilla LVEA YES Turning down power 16:37
16:00 SUS Jeff, Rahul LVEA YES Checking RM pointing (Jeff out 16:40) 16:43
16:00 EE Fil CER YES Checking if PM1 is jumpered 16:14
16:39 EE Fil LVEA n Running cables 18:21
16:40 EX Eric EX n Looking for hot breakers 17:59
16:40   Camilla LVEA YES Transitioning us back to laser safe 16:48
16:44 ISC Betsy LVEA n Last minute checks on HAM1 table 17:40
16:57 SUS Jeff CER n Checking SUS coil drivers 17:00
17:04 VAC Travis LVEA n Prepping for doors 18:34
17:09 FAC Kim, Nellie EY n Tech clean 17:50
17:09 PCAL Tony PCAL Lab y(local) Packing up standards 18:28
17:24 VAC Jordan, Janos LVEA n HAM1 doors 18:41
17:26 VAC Gerardo LVEA n HAM1 Doors 18:41
17:44 FAC Chris MY n Checking noisy bearing 18:24
17:45 EE Jackie LVEA n Helping Fil with cables 18:21
17:53 SUS RyanC CR n OpLev charge meas for ends 19:21
18:16   Elenna LVEA n Watching doors get put on 18:21
18:22 EE Fil, Jackie CER n ISC cabling for HAM1 19:36
18:34 ISC Camilla, Betsy LVEA YES Transitioning to Laser Hazard and checking beams at ports 19:07
18:57 FAC Nellie LVEA CERish YES Restocking garb 19:26
19:24 VAC Jordan LVEA N Door work 21:51
19:33 VAC Janos, Gerardo, Travis, Randy LVEA n Putting on second door (Janos, Travis, Randy out 21:30) 21:51
19:44 FAC Eric EY n Checking breaker panel temps 21:16
20:15 CDS Jonathan, Dave MSR n Swapping frame writer power supply 20:47
20:46   Jeff LVEA n Returning laptop 20:48
20:47 TCS Camilla LVEA n Checking CO2X table parts (laser is off) 21:13
20:48 CDS Dave EY n Checking cameras 21:56
21:13 PCAL Tony PCAL Lab y(local) Starting measurement 22:46
21:40 FAC Randy LVEA n Helping with doors 21:51
21:46 EE Fil LVEA n Finishing up HAM1 cables 23:34
21:46   Richard LVEA n Trying to not help out 21:55
21:56 CDS Dave EX n Checking other cameras 22:58
22:26 SEI Jim, Mitchell LVEA n Moving Class A stuff out of HAM3 cleanroom 22:43
22:41 VAC Jordan, Gerardo LVEA n Prepping HAM1 for pumpdown 23:34
23:17 TCS Camilla LVEA n Measuring a distance and looking in the TCS cabinets 23:34