TSC Install work at BSC1, 2, 3 from 16:00 to 00:00 Friday 8th Electronics cabling work at HAM6 Apollo craning various items in the LVEA Apollo working on spool install at End-X 09:02 Patrick & Thomas working on IOO Rotation State in H1-PSL enclosure 09:13 Hugh & Mitch HEPI actuator install at BSC3 09:20 Cheryl working at HAM2/3 and in the H1-PSL 10:05 Kyle working on GV6 10:15 Dave add SUS ITM-X to IOP watchdog 11:45 Justin transition LVEA South bay to local laser hazard 13:15 Frank & Louis pulling cables at End-Y 13:25 Dave recycling H1SUSETMY 13:40 Keita & Koji in H2-PSL enclosure working on OMC