Reports until 16:31, Tuesday 20 May 2025
LHO General
ryan.short@LIGO.ORG - posted 16:31, Tuesday 20 May 2025 (84491)
Ops Day Shift Summary

TITLE: 05/20 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: HAM1 is now pumping back down and will go overnight. Binary and coil driver chassis for RMs and PM1 were updated, see alog84490. The broken L4C at HAM2 is currently being replaced. All optics in HAMs 1 & 2 are now ALIGNED.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:39 FAC Kim, Nellie LVEA N Technical cleaning 16:06
15:37 VAC Jordan LVEA N Purge air and pump checks 15:53
15:50 CDS Fil LVEA N VAC and ISC cabling 19:05
16:49 CDS Jackie LVEA N VAC and ISC cabling 19:05
17:00 VAC Janos LVEA N Checking pumps 17:10
17:02 FAC Kim, Nellie EX, EY N Restocking garb 17:39
17:19 AOS Betsy LVEA N Cleanup around HAM3 18:11
17:26 SUS Rahul LVEA N Toolpan cleanup around HAM3 17:31
17:57 ISC Camilla LVEA N Toolpan cleanup around HAM3 18:33
17:58 FAC Nellie FCES N Technical cleaning 18:32
18:00 VAC Travis LVEA N Checking on cabling 18:41
18:32 FAC Nellie MX N Technical cleaning 19:01
18:45 VAC Travis, Jordan LVEA N Starting HAM1 pumpdown 19:22
19:26 CDS Daniel LVEA N Electronics checks 19:44
20:13 SUS Fil LVEA N PM1 and RM electronics swaps 22:00
20:42 VAC Travis LVEA N Craning leak checker, checking pumpdown 23:19
20:58 VAC Jordan LVEA N Joining Travis 23:19
20:58 CAL Tony PCalLab Local   21:22
22:15 VAC Janos LVEA N Joining VAC team 22:27
22:30 CDS Jackie CER N Retrieving tools 23:30
22:32 VAC Janos MX N Measurements 22:54
22:36 SEI Jim, Tony LVEA N HAM2 L4C repair Ongoing
22:48 ISC Daniel LVEA N ISC rack electronics 23:19