Today we installed the missing dual demod chassis in ISC-R2, and Fil pulled the controls cable for the delay line. I then tested that the delay line can be controlled through EPICS and that there are readbacks from the demod chassis.
This complets the hardware installation for the LSC-REFL_B chain.