The HAM1 floor cable tray near the PSL was reinstalled. Removed for the ISI installation. All cables on flanges D4 and D6 are dressed in front of the SEI cross beam. Cables are usually pulled behind the cross beam to avoid cables resting on the beam and to provide strain relief. More work needed to finish cable dressing/strain relief.