We removed all cables belonging to the analog cameras as well as a 12V power distribution box. Removed the video feedthrough panel and replaced it with a PEM feedthrough panel that previsouly was mounted on the other side.
We removed the cables associated with the 2 original in-air WFS. Removed the 2 feedthrough panels associated with the WFS.
We de-cabled the Mad City Lab PZT steering mirror, but did not remove it yet.