Displaying report 1-1 of 1.
Reports until 17:33, Thursday 22 May 2025
LHO General
ryan.short@LIGO.ORG - posted 17:33, Thursday 22 May 2025 (84552)
Ops Day Shift Summary

TITLE: 05/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Another busy day! After some pumpdown troubleshooting this morning, ISCT1 was rolled back into place, its bellows were attached, and beam alignment on the table is ongoing. Cycled ISC_LOCK through DOWN and SDF_REVERT, but ran into an issue where ETM ESD chassis needed to be restarted after the power outage last night. I also ran a quick rotation stage calibration.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:58 FAC Kim, Nellie LVEA N Technical cleaning (Nellie out @ 16:00) 17:12
14:59 FAC Chris LVEA N Retrieving parts 15:02
15:21 VAC Janos LVEA N Troubleshooting HAM1 pumpdown 16:01
15:43 SEI Jim LVEA N Locking HAM1 HEPI 15:53
15:55 FAC Richard LVEA N Checks 16:03
16:00 AOS Jeff OptLab N Dropping off parts 16:13
16:07 SEI Mitchell, Randy, Corey EX N Wind fence work 19:19
16:19 ISC Camilla, TJ, RyanC, Oli LVEA N Moving ISCT1 into place 17:04
16:27 FAC Janos, Chris LVEA N Retrieving rigging equipment 16:29
16:59 FAC Richard LVEA N Checks 17:09
17:04 ISC Camilla, TJ LVEA N ISCT1 bellows 17:16
17:16 CDS Fil LVEA N Cabling ISCT1 19:59
18:39 SAF Camilla, TJ LVEA N Looking for RS key 18:47
19:37 VAC Janos LVEA N Checking on HAM1 bellows 19:46
20:03 ISC TJ LVEA YES Transition to Laser HAZARD 20:25
20:59 SEI Corey EX N Wind fence work 21:39
21:06 CAL Tony PCalLab Local   21:14
21:14 ISC Elenna LVEA YES ISCT1 alignment Ongoing
21:16 ISC TJ LVEA YES ISCT1 alignment 23:26
21:34 VAC Janos LVEA - Valve in ion pump to HAM1 22:34
21:40 EE Fil EX N Checking ESD HV chassis 22:09
21:41 EE Marc EY N Checking ESD HV chassis 22:09
22:18 ISC Sheila LVEA YES ISCT1 alignment Ongoing
23:02 ISC Camilla LVEA YES ISCT1 alignment Ongoing