After ISCT1 alignment worked wrapped up for the day, I ran a calibration sweep of the PSL rotation stage following the steps outlined in alog79596.
The measurement file, new calibration fit, and screenshot of newly accepted SDFs are attached.
Power in (W) | D | B (Minimum power angle) | C (Minimum power) | |
Old Values | 94.908 | 1.990 | -24.819 | 0.000 |
New Values | 95.252 | 1.990 | -25.787 |
0.000 |
Interestingly, even after updating the calibration factors and searching for home on the stage, there are still 2.2W into the IMC with a 2.0W request, so this may need revisiting later.