Displaying report 1-1 of 1.
Reports until 07:43, Friday 23 May 2025
LHO General
corey.gray@LIGO.ORG - posted 07:43, Friday 23 May 2025 (84559)
Fri Ops Day Transition

TITLE: 05/23 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Ryan C
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 4mph Gusts, 1mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.10 μm/s
QUICK SUMMARY:

Sheila is sorting through the state of alignment which will then lead to continuing ISCT1 alignment work out on the floor.  Mitch and Randy are at EX starting on the wind fence.

Displaying report 1-1 of 1.