cheryl.vorvick@LIGO.ORG - posted 15:06, Sunday 10 November 2013 (8456)
IO Alignment, PMC recovery, and prep for PSL ISS Array

Friday was a busy day!

 

--- PSL ISS Cable Install - Jim, Mitchel

They got the cables installed in the flange with the worst access.

 

--- PSL PMC recovery - Filiberto, Stefan, Sheila

Replaced PMC electronics and brought the PMC back to stable locking.

 

--- IMC alignment - Peter, Justin, Cheryl

Input beam from the PSL was aligned to the IMC irises.  I aligned the IMC and it is flashing.

-----------------------------------

 

On Monday, there is still a fair amount of alignment to do in HAM2 before the PSL ISS can be installed.


1) IMC alignment check - check to see that the PSL beam is still well aligned, and flashing is good

2) Align through FI - requires aligning the beam to PR2 in HAM3

3) Reroute MC REFL as IMC TRANS

When these alignments have been completed, the PSL ISS Assembly can be installed in HAM2

-----------------------------------

 

IO install work to do latter in the week:


- remove, rework, and replace the PR2 scraper baffle